Sign In | Join Free | My tjskl.org.cn |
|
Categories | Shale Shaker |
---|---|
Brand Name: | Pangolin |
Place of Origin: | Hebei China |
Price: | Negotiable |
Payment Terms: | T/T |
Delivery Time: | 5-15work days |
Packaging Details: | According to customer needs |
Capacity: | 50-240 ㎥/h (200-1000GPM) |
Separation Stage: | 2stage / 3stage |
Customized: | YES |
Tank Volume: | 5-30 ㎥ |
Total Power: | 25-184 Kw |
Screen Area: | 2.2-8.4 ㎡ |
Total Weight: | 5.5-20 t |
Land Transport Dimension (mm): | Customized |
1000 GPM Trenchless HDD Drilling Mud Recycling Unit
HDD Drilling Mud Recycling Unit, Mud Process System
Introduction
HDD mud recycling system is design for Horizontal Directional
Drilling ( HDD ) rig.
According to the drilling mud demand, HDD mud recovery system can
include shale shale shaker, desander cyclone, desilter centrifuge,
mud tank, mud mixer, mud gun, delivery pump, etc. The size of the
screen hole depends on the performance of the shale shaker, which
is suitable for mud flow and drilling mud separation with different
mud requirements.
The main structure features
1. Good productivity and performance: the production capacity of
the system is up to 240m3 / h (1000gpm), which can meet the
requirements of mud treatment in large-scale trenchless projects.
2. All parts of the equipment are connected quickly, easy to
disassemble and save time.
3. The high wear-resistant polyurethane cyclone dust collector is
the same as the international brand, which can be used for more
than 3800 hours, with long service life and interchangeability.
4. The explosion-proof lamp can meet the requirements of night
construction, which is easy to operate and safe.
Product parameters
Customized | YES |
Capacity | 50-240 ㎥/h (200-1000 GPM) |
Screen Area | 2.2-8.4 ㎡ |
Separation Stage | 2stage / 3stage |
Tank Volume | 5-30 ㎥ |
Total Power | 25-184 Kw |
Total Weight | 5.5-20 t |
Land Transport Dimension (mm) | customized |
Screen material | Polyurethane |
Cyclone (mm) | 250 -900 |
Impeller material | Cr26 |
Application | Drilling |
Specification | Can be customized according to requirements |
Model | CSJ-FN-30C | CSJ-FN-60C | CSJ-FN-120C | CSJ-FN-200C | |
Capacity (m3/h) | 30 | 60 | 120 | 200 | |
Slurry pump | Model | DC-EHM-1.5C | DC-EHM-3C | DC-EHM-3C | DC-EHM-4C |
Power (Kw) | 7.5 | 11 | 22 | 37 | |
Pressure (MPa) | 1.0~2.0 | ||||
Shale shaker | Power(Kw) | 1.5 | 2 | 3 | 3 |
Vibration force(KN) | 30 | 40 | 60 | 60 | |
Screen size (mm) | UP | 1400X600 | 1700x700 | 1900X1000 | 2100x1200 |
Down | 1400X600 | 1700x700 | 1900X1000 | 2100x1200 | |
Cone Model | FN-100 | FN-150 | |||
Cone Number | 3 | 6 | 12 | 8 | |
Separation size (μm) | 10-30 | ||||
Total Power (KW) | 9 | 13 | 25 | 40 | |
System Max.Size(mm) | 1650X1450X2150 | 2000X1600X2250 | 2170X2000X2400 | 2400*2300*2400 | |
System weight (Kg) | 1200 | 1900 | 2500 | 3500 |
HDD Mud Recycling System Working Procedure
1. There is a drill pit at each side of drilling hole, a set of
vertical slurry pump will set on top of mud pit for feeding shale
shaker. The shale shaker screen will separate drilling cuttings and
discharge out, fluids part will drop into sand trap through screen
hole.
2. 1 or 2 or 3 sets of desander cyclone sit after shale shaker, one
set of centrifugal pump will feed desander cyclong for second phase
separation, solids out of desander will be discharge to shaker
screen or cutting box directly and fluids over flow from desander
will flow into desander compartment.
3. A quantity of desilter cyclones will sit after desander for fine
solids separation, solids out of desilter will discharge to shaker
screen or cuttings box, fluids over from desilter will drop into
desilter compartment.
4. A mixing pump sit on tank skid for drilling mud transfer and
feed mud into mud hopper for new mud remix by new chemicals. The
mixing hopper can sit on top of tank or tank skid as per client’s
demand.
Advantages
1. Modular design, small footprint, flexible configuration and
installation according to customer requirements.
2. The side plate of mud tank is designed to be corrugated and
load-bearing, which is safer and can bear more load.
3. The installation and disassembly are simple and convenient for
the drilling personnel to move frequently.
4. The system adopts centralized electrical control, which is easy
to operate.
5. All equipment are designed to be corrosion-resistant and
wear-resistant with long service life.
6. It adapts to the harsh drilling operation conditions and has the
functions of cold resistance, heat resistance, explosion-proof,
leak proof, corrosion-resistant and rain proof.
Pic Show
FAQ:
1. How to order the products?
A: Please send the inquiry with detail item description or with Model number.
2. How about the common packing?
A: If there is no special packing demand, we will take it as our normal packing. First in small carton, and then put in the bigger carton together to make sure goods completed.
3. Can I expect a quality products?
A: Yes. mature production technology ensuring the quality satisfy international request.
4. How to check if the product is what you want?
A: If possible, please attach a reference picture so as not to cause any misunderstanding or any links on our website for better understanding.
5. How to control the quality?
A: We have our own experienced QC team and will conduct rigorous inspection and testing on each order before shipment.
6. Fast delivery time:
A: Usually it takes 25 days for production.only 3 or 5 days if we have stock of your request size.
7. Competitive price:
A: Our factory can supply you the lowest price due to direct sale to customers without distributor!
![]() |